※ PT PLN • 2018 ※
Extension of Conveyor 1 & 2, Emergency Telescopic Chute and Ship Unloader at PLTU Paiton Unit 9
Outline of Project :
Development of Extension of Conveyor 1 & 2, Emergency Telescopic Chute & Ship Unloader
Scope of Work :
Engineering, Procurement, and Construction (EPC) for Electrical, Instrumentation, Automation & Control package such as:
- MV & LV Switchgear - PLC & SCADA System
- Cabling & Cable Support System - Installation, Testing & Commissioning
- Lighting & Receptacle System - Training
- Lightning & Grounding System
- Safety Device & Instrumentation
※ Kementrian Kelautan dan Perikanan RI • 2017 ※
Integrated COOL Storage
Outline of Project :
Development Integrated Cool Storage (ICS) Capacity 100 Tons.
Scope of Work :
Mechanical, Electrical & Plumbing (MEP) Area Cool Storage & Employee Building Facilities package such as:
- LV Switchgear
- Cabling & Cable Support System
- Lighting & Receptacle System
- Lightning & Grounding System
- Installation
- Testing & Commissioning
※ PT PLN • 2017 ※
Mobile Power Plant & Fixed Type Gas Engine Power Plant AT Biak-Tanjung Selor-Merauke-Seram-Langgur
Outline of Project :
Development Mobile Power Plant & Fixed Type Gas Engine of 15 MW (Biak & Tanjung Selor) dan 20 MW (Merauke, Seram dan Langgur).
Scope of Work :
Engineering, Procurement and Construction (EPC) for Electrical, Instrumentation, Automation and Control package such as:
- MV & LV Switchgear - Field Device & Instrumentation
- Transformer - DCS System
- Cabling & Cable Support System - Public Address & Communication Sys
- Lighting & Receptacle System - Fire Protection & Clean Agent System
- Lightning & Grounding System - Installation, Testing & Commissioning
- UPS, Battery & Battery Charger - Training
※ PT Indonesia Power • 2016 ※
Conveyor System for Jetty 2 to PLTU Suralaya Banten 1
Outline of Project :
Development Conveyor System for Jetty-2 to PLTU Suralaya Banten 1.
Scope of Work :
Engineering, Procurement and Construction (EPC) for Electrical, Instrumentation, Automation & Control package such as:
- MV & LV Switchgear - PLC & SCADA System
- Transformer - Public Address & Communication Sys.
- Cabling & Cable Support System - Fire Protection System
- Lighting & Receptacle System - Installation, Testing & Commissioning
- Lightning & Grounding System - Training
- UPS, Battery & Battery Charger
- Safety Device & Instrumentation
※ PT PUPUK KALTIM • 2015 ※
Urea Bulk Storage & Conveyor System Project
Outline of Project :
Development of Urea Bulk Storage complete with conveyor facility consist of portal scraper, conveyor - tripper - bagging system, and dehumidifier.
Scope of Work :
Engineering, Procurement and Construction (EPC) for Electrical, Instrumentation, Automation and Control package such as:
- MV & LV Switchgear - Safety Device & Instrumentation
- Transformer - PLC & SCADA System
- Cabling & Cable Support System - Public Address & Communication Sys.
- Lighting & Receptacle System - Fire Protection & Clean Agent System
- Lightning & Grounding System - Installation, Testing & Commissioning
- UPS, Battery & Battery Charger - Training
※ PT BUKIT ASAM • 2015 ※
Tanjung Enim Coal Handling Facilities Phase-4 (CHF-4)
Outline of Project :
Development of CHF at MTBU-B Stage 2 & OLC MTB & Banko Barat load in & out system consist of feeder - reclaim feeder, train loader & conveyor.
Scope of Work :
Engineering, Procurement and Construction (EPC) for Electrical, Instrumentation, Automation & Control package such as:
- MV & LV Switchgear - UPS, Battery & Battery Charger
- Transformer - Safety Device & Instrumentation
- 20kV Overhead Line Transmission - PLC & SCADA System
- Cabling System - Public Address & Communication Sys.
- Cable Support System - Installation, Testing & Commissioning
- Lighting & Receptacle System - Training
- Lightning & Grounding System
※ PT BUKIT ASAM • 2015 ※
Tanjung Enim Coal Handling Facilities Phase-5 (CHF-5)
Outline of Project :
Development of CHF at existing location of Muara Tiga Besar, consist of reclaim feeder - conveyor, quadrol crusher and overhaul conveyor.
Scope of Work :
Engineering, Procurement and Construction (EPC) for Electrical, Instrumentation, Automation & Control package such as:
- MV & LV Switchgear - UPS, Battery & Battery Charger
- Transformer - Safety Device & Instrumentation
- 20kV Overhead Line Transmission - PLC & SCADA System
- Cabling &Cable Support System - Public Address & Communication Sys.
- Lighting & Receptacle System - Installation, Testing & Commissioning
- Lightning & Grounding System - Training
※ PT Aneka Tambang • 2014 ※
NON CRUCIBLE ESF IV ANEKA TAMBANG
Outline of Project :
Development of non crucible system for ESF IV consist of hot charge crane, top bin modification, furnace auxiliaries, tapping metal equipment.
Scope of Work :
Engineering, Procurement and Construction (EPC) for Electrical, Instrumentation, Automation & Control package such as:
- MV & LV Panel - Field Instrument
- Transformer - DCS & HCC PLC System
- Power Cable - Lighting & Receptacle System
- Field Panel - Lightning & Grounding System
- Control & Instrument Cable - HVAC System
- Cable Support System - Installation, Testing & Commissioning
※ PT PUSRI • 2014 ※
Jetty, Coal Handling System, and Coal Storage & Facilities
Outline of Project :
Development of Jetty, Coal Storage and Conveyor System.
Scope of Work :
Engineering, Procurement and Construction (EPC) for Electrical, Instrumentation, Automation and Control package such as:
- MV & LV Switchgear - PLC & SCADA System
- Transformer - Public Address & Communication Sys.
- Cabling & Cable Support System - Fire Protection System
- Lighting & Receptacle System - Installation, Testing & Commissioning
- Lightning & Grounding System - Training
- UPS, Battery & Battery Charger
- Safety Device & Instrumentation
※ PT PUSRI • 2013 ※
Urea Bulk Storage (UBS) IIB & Conveyor System (CS)
Outline of Project :
Development of non crucible system for ESF IV consist of hot charge crane, top bin modification, furnace auxiliaries, tapping metal equipment.
Scope of Work :
Development of Urea Bulk Storage complete with conveyor facility consist of portal scraper, conveyor - tripper - bagging System, and dehumidifier.
- MV & LV Switchgear - Safety Device & Instrumentation
- Transformer - PLC & SCADA System
- Cabling & Cable Support System - Public Address & Communication Sy.
- Lighting & Receptacle System - Fire Protection & Clean Agent Sys.
- Lightning & Grounding System - Installation, Testing & Commissioning
- UPS, Battery & Battery Charger - Training
- Safety Device & Instrumentation
※ PT BPT BUKIT ASAM • 2012 ※
Tarahan Port Expansion Phase
Outline of Project :
Development of 3000 TPH Coal Handling Facility Consist of Wagon Un-loader, Conveyor System and Ship Loader.
Scope of Work :
Engineering, Procurement and Construction (EPC) for Electrical, Instrumentation, Automation and Control package such as:
- MV & LV Switchgear - Safety Device & Instrumentation
- Transformer - PLC & SCADA System
- Neutral Grounding Resistor - Public Address & Communication Sys.
- Cabling & Cable Support System - CCTV System
- Lighting & Receptacle System - Cathodic Protection
- Lightning & Grounding System - Installation, Testing & Commissioning
- UPS, Battery & Battery Charger - Training
※ PT NUSA TAMBANG PRATAMA • 2011 ※
Asam-Asam Coal Preparation Plant and Overland Conveyor
Outline of Project :
Development of 2400 TPH Coal Handling Facility Consist of Crushing System and Transport to Port via about 9000 meters Overland Conveyor.
Scope of Work :
Engineering, Procurement and Construction (EPC) for Electrical, Instrumentation, Automation and Control package such as:
- Genset & COntrol Panel 3 x CAT 3516
- MV Panel
- MCC Panel
- VVVF Panel
- Neutral Grounding Resistor
- PLC & SCADA System
- Installation, Testing & Commissioning
<
>
PROFESSIONAL REFERENCE
• PT PLN | Merauke-Biak-Langgur-Seram-Tanjung Selor | 2017
Mobile Power Plant & Fixed Type Gas Engine Power Plant Package III
• PT. Indonesia Power | Cilegon, Banten | 2016
Conveyor System for Jetty 2 to PLTU Banten 1
• PT. Pupuk Kaltim | Bontang, Kalimantan Timur | 2015
Urea Bulk Storage & Conveyor System Project
• PT. Bukit Asam | Palembang, Sumatera Selatan | 2015
Tanjung Enim Coal Handling Facilities Phase 4
• PT. PUSRI | Palembang, Sumatera Selatan | 2014
NPK Fushion Plant Capacity 100.000 MTPY
• PT. Bukit Asam | Tanjung Enim, Sumatera Selatan | 2014
Tanjung Enim Coal Handling Facilities Phase 5
• PT. PLN | Tanjung Enim, Sumatera Selatan | 2014
Ash Handling Facilities PLTU Tanjung Enim
• PT. Aneka Tambang | Pomalaa, Sulawesi Tenggara | 2014
Non Crucible ESF-IV Aneka Tambang
• PT. PUSRI | Palembang, Sumatera Selatan | 2014
Jetty, Coal Handling System, and Coal Storage & Facilities
• PT. PUSRI | Palembang, Sumatera Selatan | 2013
Urea Bulk Storage 2B & Conveyor System
• PT. Bukit Asam | Tarahan, Lampung | 2012
Tarahan Port Expansion Phase 5
• PT. Kaltim Prima Coal | Sangatta, Kalimantan Timur | 2012
Barge Loading Facility Extension Project
• PT. Krakatau Bandar Samudera | Cilegon, Banten | 2012
Feasibility Study for New Jetty Facilities
• PT. Krakatau Bandar Samudera | Cilegon, Banten | 2012
Feasibility Study for Interconnecting Belt Conveyor
• PT. Aneka Tambang | Pomalaa, Sulawesi Tenggara | 2012
Feasibility Study for Modernization & Optimization ANTAM Fe-Ni Halmahera (Phase-1)
• PT. Aneka Tambang | Pomalaa, Sulawesi Tenggara | 2012
Feasibility Study for Modernization & Optimization Fe-Ni 1 Plant
• PT. Unbrown Coal Indonesia | Satui, Kalimantan Selatan | 2009
Basic Design for Upgraded Brown Coal Plant Modernization
• PT. Merak Energi | Merak, Banten | 2012
Merak Energy Material Handling System
• PT. Nusa Tambang Pratama | Batulicin, Kalimantan Selatan | 2011
Batulicin Coal Handling Facilities
• PT. Indonesia Power | Suralaya, Banten | 2010
Coal Handling Facility IP-8
• PT. Nusa Tambang Pratama | Asam-Asam, Kalimantan Selatan | 2010
CPP & OLC Asam-Asam Coal Mine Project
• PT. Shibaura Shearing | MM2100, Cibitung, Bekasi | 2010
Semi Gantry Crane
• PT. Semen Tonasa | Tonasa, Sulawesi Selatan | 2010
Baghouse Filter 89,500 Nm3/h for 2×35 MW Tonasa Power Plant
• PT. Indocement | Cibinong, Jawa Barat | 2010
Indocement Recovery Material Handling System
• PT. PLN | Maluku Utara | 2010
Baghouse Filter 75,000 m3/h for 2×7 MW PLTU MALUT
• PT. Bharinto Ekatama | Melak, Kalimantan Timur | 2010
Coal Crushing Plant PT. Bharinto Ekatama
• PT. Pupuk Kaltim | Bontang, Kalimantan Timur | 2010
Coal Boiler Plant PT. Pupuk Kaltim
• PT. Pupuk Kaltim | Bontang, Kalimantan Timur | 2010
Bontang Ammonium Nitrat Prill Project
• PT. Krakatau Bandar Samudera | Cilegon, Banten | 2010
Cigading International Bulk Terminal Stage-1
• PT. Unbrown Coal Indonesia | Satui , Kalimantan Selatan | 2009
Upgraded Brown Coal Plant Modernization
• PT. Indominco Mandiri | Bontang, Kalimantan Timur | 2009
Workshop, Crushing & Skyline Conveyor for East Block Development System PT. Indominco Mandiri
• PT. Meratus Jaya Iron Steel | Batulicin, Kalimantan Selatan | 2009
Material Handling System for 315.000 TPY Direct Reduction Rotary Kiln Plant
• PT. Yamatogawa | Tangerang, Banten | 2009
Drying Room and Steam Boiler for Paper Core
• PT. Petrokimia Gresik | Kuala Tanjung, Sumatera Utara | 2008
ROP I / II and NPK III / IV Petrokimia Gresik Project
• PT. Shibaura Shearing | MM2100, Cibitung, Bekasi | 2008
Cranes for SSI 2nd Factory Cap 10T. 5T and 3T (21 Units Crane Overhead & Semi Gantry)
• PT. Aneka Tambang | Pomalaa, Sulawesi Tenggara | 2008
Bag Filter Fe-Ni 2
• PT. Yamaha Motor Manufacturing | KIIC, Karawang, Jawa Barat | 2008
Yamaha Waste Water Treatment
LiVi Construction
Rejuvenate Integrated Solution
Since established in 2012, PT Livia Andalan Indonesia has been growing as enterprising company. Forged by excellent experiences and eager in advancing knowledge. We stand for the most reliable and progressive company on integrating solution for civil & structure, mechanical, electrical ...
more about us
a member of LiVi Group
© PT Livia Andalan Indonesia | LiVi Group. All Rights Reserved.